The following files contain the applicable grid connection ordinance (NAV) and the technical grid connection conditions (TAB) for the low-voltage grid.
Connection use contract
Grid connection contract
We Supply Everything You Need
Be it electricity, water, heating or cooling – we take care of whatever is required for site development and operation of your property. We order and build grids and facilities, secure grid distribution for electricity and other media, and handle measurement and billing.
In a nutshell, we guarantee our customers an optimal power supply at all times.
The following files contain the applicable grid connection ordinance (NAV) and the technical grid connection conditions (TAB) for the low-voltage grid.
Connection use contract
Grid connection contract
Fraport imposes charges for use of the medium- and low-voltage grid.
The following files contain the current grid usage charges, their period of validity and the grid usage contract.
Grid usage contract (valid as of 1 April, 2022)
Grid usage contract
List of grid usage charges
Here you will find information on grid structure data and the peak load time window for Frankfurt Airport as specified in the regulation on access to electricity supply grids. This takes into account section 17 (2) of the Electricity Grid Access Ordinance (StromNZV) under which the operator of an electricity distribution grid is required to publish information relevant to the grid.
Electricity grid structure data
Peak load time window
Fraport undertakes metering point operation for customers that it supplies with electricity.
As a result of the deregulation of metering point operation introduced under section 21b of the German Energy Economy Law (EnWG), connection users may arrange for metering point operation to be performed by a third party.
This requires a metering point framework agreement between the metering service provider and Fraport. The rates that apply to Fraport’s metering point operation services can be found in the metering point operation price list.
Metering point agreement
In accordance with section 13 (3) of the Electricity Grid Access Ordinance (StromNZV), the standard prices for surplus/shortfall quantities must be calculated and published based on the current monthly market price.
The following files contain the prices for calculating surplus/shortfall quantities and the current version of the certificate for resellers Fraport AG and Energy Air GmbH.
Surplus/shortfall quantities
Certificate for resellers
Would you like to know more? Please don't hesitate to contact us